|
A17.1-1996 : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
|
|
Post current State Elevator Certificate.
|
10/16/2025
|
|
A17.1-1996 : Elevators
|
1.6 - Car emergency signal
|
211.1 Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days)
|
x
|
|
Existing phone works, but goes to another contractor. Reprogram.
|
10/16/2025
|
|
A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
8.6.4.19.7 (Re-Inspection)
|
x
|
|
Provide existing battery backup lowering unit to work properly.
|
10/16/2025
|
|
A17.1-2016 : Elevators
|
5.15 - Overspeed Valve
|
8.6.5.16.5
|
x
|
|
OSV is due for testing, provide.
|
10/16/2025
|
|
A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
8.6.4.19.7 (Re-Inspection)
|
x
|
|
Provide existing battery backup lowering unit to work.
|
9/14/2023
|
|
A17.1-2016 : Elevators
|
2.40 - Maintenance Records
|
8.6.1.2.1(a)
|
|
|
Provide MCP.
|
9/14/2023
|
|
A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
8.6.4.19.7 (Re-Inspection)
|
x
|
|
Provide battery for backup lowering unit to work
|
8/7/2025
|
|
conversion
|
conversion
|
n/a
|
|
|
Repair top floor hall button and direction arrow cover in cab
|
11/17/2020
|
|
conversion
|
conversion
|
n/a
|
|
|
Door operates sluggish in Phase II
|
11/17/2020
|
|
conversion
|
conversion
|
n/a
|
|
|
Stop switch is not overridden in phase I reinspect
|
11/17/2020
|