MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.5.5.1 Examination and Maintenance
|
|
|
Replace leaking plunger packing seals
|
3/21/2023
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.4.7 Cleaning of Hoistway and Pit
|
|
|
Remove hydraulic oil from pit floor.
|
3/21/2023
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.2.1 General Maintenance Requirements Documentation
|
|
|
No maintenance control plan on site
|
3/21/2023
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.4.1(a) On-Site Maintenance Records (MCP Records)
|
|
|
No maintenance records on site
|
3/21/2023
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Test pressure relief. Pressure guage on valve is defective
|
1/13/2023
|