MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.4.11 Runby (Re-Inspection)
|
Yes
|
No
|
The counterweight runby is 2" due to rope stretch. Remove blocking from bottom of counterweight or shorten suspension cables to maintain 6" minimum of runby. Re-inspection required
|
|
|
A17.1-2016 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
8.6.4.19.6
|
Yes
|
No
|
When testing phase I fire service, the visual indicator light failed to illuminate, needs repaired. Re-inspection required
|
|
|
A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
8.6.4.19.7 (Re-Inspection)
|
Yes
|
No
|
When testing the elevator on emergency power, the emergency power jewel failed to illuminate, needs repaired. Re-inspection required
|
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.5 - Car lighting and receptacles
|
2.14.7.4 Protection of Light Bulbs and Tubes
|
No
|
No
|
The emergency light fixture inside the elevator has a broken glass cover plate that is a potential cutting hazard to passengers. Replace broken cover plate, no reinspection required.
|
7/30/2020
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.15 - sign and operating device symbols
|
8.11.2.1.1(o)
|
No
|
No
|
There are a number of Braille floor indicating/push button tags that are missing on multiple floors and shall be reinstalled for proper floor identification.
|
7/30/2020
|
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
Yes
|
No
|
The testing has not been completed on the elevator at this time. The unintended motion, fireman’s service, and emergency power testing shall be performed before the inspection is completed.
|
6/4/2025
|
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
Yes
|
No
|
The testing has not been completed on the elevator at this time. The fire service and emergency power testing shall be performed before the inspection is completed.
|
6/11/2025
|
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
Yes
|
No
|
The testing has not been completed on the elevator at this time. The fire service and emergency power testing shall be performed before the inspection is completed. Re-inspection required
|
6/22/2026
|
|
MO Minimum : Elevators
|
(I) - Pits
|
(I)1
|
No
|
No
|
The elevator pit floor is covered in dust and debris. The pit shall be cleaned.
|
6/22/2026
|
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.4.1(a) On-Site Maintenance Records (MCP Records)
|
No
|
No
|
There shall be maintenance records kept in the elevator machine room accessible to the inspector depicting dates and descriptions of maintenance tasks performed, callbacks, examinations, tests, adjustments, replacements and wiring diagrams. This shall be in accordance to the requirements in the Maintenance Control Program. Electronic means has NOT been approved by the State of Missouri.
|
6/22/2026
|
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.6 General Maintenance Methods
|
No
|
No
|
The tension on the hoist ropes is not equal which is resulting in unequal wear of the hoist ropes and the main drive sheave. Properly tension the hoist ropes.
|
6/22/2026
|
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
Yes
|
No
|
The testing has not been completed on the elevator at this time. The fire service and emergency power testing shall be performed before the inspection is completed. Re-inspection required
|
7/29/2026
|
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.4.11 Runby (Re-Inspection)
|
Yes
|
No
|
The counterweight runby is 2" due to rope stretch. Remove blocking from bottom of counterweight or shorten suspension cables to maintain 6" minimum of runby. Re-inspection required
|
7/29/2026
|