Missouri Minimum : Escalators
|
(T) - Existing Dumbwaiters, Escalators and Moving Walks
|
(T)2(G)
|
|
|
Step indexing needs to be completed, Re-inspection due in 30 days
|
|
Missouri Minimum : Escalators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) display of certificate
|
|
|
Post current certificate
|
|
Missouri Minimum : Escalators
|
(T) - Existing Dumbwaiters, Escalators and Moving Walks
|
8.6.1.4 Maintenance Records
|
|
|
A copy of the MCP shall be kept in the machine room for each unit
|
|
Missouri Minimum : Escalators
|
(T) - Existing Dumbwaiters, Escalators and Moving Walks
|
8.6.1.4 Maintenance Records
|
|
|
Provide written maintenance control program to include wiring diagrams to be kept on site.
|
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.3.1 Replacement Parts
|
|
|
Replace leaking drive gearbox seal
|
|
A17.1-2016 : Elevators
|
7.3 - Handrails
|
8.6.8.1
|
x
|
|
Replace deteriorating right handrail
|
|
Missouri Minimum : Escalators
|
(T) - Existing Dumbwaiters, Escalators and Moving Walks
|
8.6.8.13 Escalator Cleaning
|
|
|
Perform unit cleandown.
|
|
Missouri Minimum : Escalators
|
(T) - Existing Dumbwaiters, Escalators and Moving Walks
|
8.6.8.13 Escalator Cleaning
|
|
|
Need to perform a unit clean down
|
|
Missouri Minimum : Escalators
|
(T) - Existing Dumbwaiters, Escalators and Moving Walks
|
8.6.8.13 Escalator Cleaning
|
|
|
Clean down unit.
|
|
Missouri Minimum : Escalators
|
(T) - Existing Dumbwaiters, Escalators and Moving Walks
|
8.6.8.3 Step/Skirt Performance Index
|
x
|
|
Perform testing, record results.
|
10/23/2024
|